Course Plan

The course runs as a set-up week and fourteen weeks of about six hours each: two hours of reading, three of lab work and one for the lab’s questions and extension task. Parts I to V fill the fourteen weeks and end with the course project, the two-stage OTA of Chapter 12, laid out and verified; Part VI follows as an optional five-week module on mixed-signal circuits, and Part VII as an optional eight-week module on layout. Instructors can use the plan as a syllabus; self-learners can use it as a pace.

Every lab has its own folder of testbenches for both PDKs in the course files (Lab 0 explains how to get them), and each one prints the values of its checkpoint table, so a week can be run on its own without repeating the weeks before it. Pick one PDK for the whole course, or let half the group use each and compare at every checkpoint.

Contents

Parts I to V: fourteen weeks

Week 0 · Set-up and the first simulation

Read: Chapter 2: the tools, IIC-OSIC-TOOLS, ngspice essentials and scripting simulations in Python.

Lab: Lab 0: install IIC-OSIC-TOOLS, download the course files, and run the inverter testbench and Chapter 2’s script in both PDKs.

Checkpoint: the inverter’s peak gain and switching threshold in both PDKs, matching the Lab 0 checkpoint table.

Week 1 · Why analog, and the two PDKs

Read: Chapter 1, Chapter 3 and the PDK Devices in 3D gallery.

Lab: the Lab 0 extension: find the PMOS width that puts the inverter’s switching threshold at VDD/2 in your PDK, and explain the ratio with Chapter 3’s on-currents.

Checkpoint: a one-page comparison of SG13G2 and SKY130 (supply, threshold, on-current, sheet resistances, MIM capacitance), with the source of every number.

Week 2 · The MOSFET

Read: Chapter 4.

Lab: Lab 1, steps 1–2: the threshold, then the square-law fit and Worked example 4.1.

Checkpoint: VTH and µCox of your PDK’s NMOS at L = 0.5 µm, and the overdrive below which the square law no longer fits.

Week 3 · Small-signal models and characterization

Read: Chapter 5.

Lab: Lab 1, steps 3–5: small-signal parameters three ways, temperature and corners; then its extension (the PMOS zero-temperature-coefficient point).

Checkpoint: gm, gds and fT of the reference device from the operating point, a DC derivative and an AC simulation, agreeing with each other, and the device’s ZTC point.

Week 4 · The gm/ID method

Read: Chapter 6.

Lab: Lab 2: the four gm/ID charts of your PDK, the slow corner, and a common-source stage sized from the lookup tables and simulated.

Checkpoint: the stage’s predicted and simulated gain and unity-gain frequency side by side, as in Table 6.1, with every difference explained.

Week 5 · Single-transistor amplifiers

Read: Chapter 7.

Lab: Lab 3, steps 1–2: three loads for the common-source stage, and a real current source.

Checkpoint: gain and output swing for the resistive, diode and current-source loads, and why the high-gain stage cannot set its own output bias.

Week 6 · Current mirrors and biasing

Read: Chapter 8.

Lab: Lab 4, steps 1, 3 and 4: three mirrors, the beta-multiplier reference and its start-up (step 2, Monte Carlo, waits for Week 11).

Checkpoint: the headroom of the basic, cascode and wide-swing mirrors, and a reference that starts in every corner.

Week 7 · Frequency response

Read: Chapter 9.

Lab: Lab 3, steps 3–5: frequency response, poles and zeros, and the cascode.

Checkpoint: the common-source stage’s two poles and right-half-plane zero calculated by hand and compared with the pole-zero analysis.

Week 8 · The differential pair and the 5T OTA

Read: Chapter 10.

Lab: Lab 5: the five-transistor OTA as a subcircuit, its gain, bandwidth, phase margin, slew rate and input range.

Checkpoint: the 5T OTA’s results against its hand design, and how far its gain falls short of the course project’s 60 dB.

Week 9 · Feedback, stability and compensation

Read: Chapter 11.

Lab: Lab 6, steps 1, 4 and 5: the loop-gain probe on the course OTA, sweeps of the Miller capacitor and the nulling resistor, and a naive loop break.

Checkpoint: phase margin against Cc and Rz, and the error the naive break makes.

Week 10 · The two-stage OTA: the course project

Read: Chapter 12.

Lab: Lab 6, steps 2–3: verify the course OTA against every line of its specification, then over five corners and three temperatures.

Checkpoint: the specification table of the course OTA in your PDK, pass or fail at every corner and temperature.

Week 11 · Noise and mismatch

Read: Chapter 13.

Lab: Lab 7: the noise of both course OTAs, the offset of 200 Monte Carlo copies of the 5T OTA, and four times the input-pair area; then Lab 4, step 2, the Monte Carlo of the mirrors.

Checkpoint: input-referred noise against Eq. (13.8), and the offset’s standard deviation against Pelgrom’s law.

Week 12 · Voltage references and regulators

Read: Chapter 14.

Lab: Chapter 14’s Try-it: add the start-up circuit of Figure 14.1 to Lab 4’s beta-multiplier and ramp the supply, with and without it, at the ss and ff corners and at −40 °C and 125 °C.

Checkpoint: the start-up transients at the four corner–temperature combinations, and the spread of the reference current.

Week 13 · Layout, verification and post-layout simulation

Read: Chapter 15 and Chapter 16.

Lab: Lab 8: generate the course OTA’s layout, run DRC and LVS, break it twice and fix it, extract it and simulate it.

Checkpoint: a DRC- and LVS-clean layout, and a table of the OTA’s gain, bandwidth and phase margin before and after layout.

Week 14 · Fabrication and tape-out

Read: Chapter 17.

Lab: the Lab 8 extension (an AABB input pair against the default ABBA), then finish the course project.

Checkpoint: the course-project report (see Assessment suggestions).

Part VI: an optional five-week module

Part VI builds mixed-signal circuits from the blocks of Parts III to V. It has no numbered labs: each chapter ends with a Try-it box whose three experiments change one design variable at a time in that chapter’s own script, and the experiments are the week’s lab. Some runs take minutes to half an hour, so start them early.

Week 15 · Switched-capacitor circuits

Read: Chapter 18.

Lab: the three experiments of Chapter 18’s Try-it, with tools/figs/ch19_switched_cap.py: wider switches, a faster clock, and single NMOS switches at the virtual ground.

Checkpoint: which integrator is parasitic-sensitive, whether the gain stage still settles to 0.1 % at 4 MHz, and in which PDK single NMOS switches still work, and why.

Week 16 · Sample-and-hold circuits

Read: Chapter 19.

Lab: the three experiments of Chapter 19’s Try-it, with tools/figs/ch20_sample_hold.py: double the transmission-gate width, open the bottom-plate switch together with the input switch, and halve the boost capacitor.

Checkpoint: the measured change in SFDR and DC error against Eq. (19.3), and the bootstrapped VGS against Eq. (19.5).

Week 17 · Comparators

Read: Chapter 20.

Lab: the three experiments of Chapter 20’s Try-it, with tools/figs/ch21_comparators.py: larger load capacitors, a lower input common mode, and a larger input pair in Monte Carlo.

Checkpoint: delay, energy and offset of the comparator against Eqs. (20.2) and (20.5).

Week 18 · Data converters

Read: Chapter 21.

Lab: the three experiments of Chapter 21’s Try-it, with tools/figs/ch22_converters.py: unit-capacitor size and DNL, the input-switch width and SFDR, and a test sine of 64 instead of 67 cycles in 4096 samples. One SAR simulation takes about 20 minutes.

Checkpoint: σDNL against Eq. (21.8), the SFDR lost with narrower switches, and why the quantization spectrum changes when the number of cycles shares a factor with the number of samples.

Week 19 · VCOs and phase-locked loops

Read: Chapter 22.

Lab: the three experiments of Chapter 22’s Try-it, with tools/figs/ch23_pll.py: a lower phase margin, a wider loop bandwidth, and a shorter reset delay in the phase-frequency detector.

Checkpoint: the overshoot at 37° of phase margin, where the linear loop model stops working, and how the reset delay changes the static phase offset and the detector’s characteristic near zero.

Part VII: an optional eight-week layout module

Part VII goes underneath the layout of Chapter 15, one kind of device per week. Like Part VI it has no numbered labs: each chapter ends with a Try-it box whose experiments change one layout or one model in that chapter’s own scripts, and the experiments are the week’s lab. The layout scripts run KLayout and Magic in the course container (Lab 0), and most take a minute or two.

Week 20 · Layout fundamentals

Read: Chapter 23.

Lab: the experiments of Chapter 23’s Try-it, with tools/figs/ch23_fundamentals.py: cut the SKY130 PMOS of the 3D gallery along a line and add the n-well to the cross-section.

Checkpoint: which drawn layers become which regions of the cross-section, and where the guard ring appears in the cut.

Week 21 · Reliability

Read: Chapter 24.

Lab: the experiments of Chapter 24’s Try-it, with tools/layout/ch24/rel_layouts.py: the longest row of transistors a single substrate tie can protect, with the tie at the end and then in the middle.

Checkpoint: the predicted and the DRC-checked largest number of fingers in each PDK, and why the two PDKs differ.

Week 22 · Resistors

Read: Chapter 25.

Lab: the experiments of Chapter 25’s Try-it, with tools/figs/_ch25_squares.py and tools/figs/ch25_resistors.py: count the squares of a serpentine, then run the SKY130 trim network with the SG13G2 design.

Checkpoint: the square count against the model’s bend formula, and which SKY130 corners can no longer be trimmed to 10 kΩ.

Week 23 · Capacitors and inductors

Read: Chapter 26.

Lab: the experiments of Chapter 26’s Try-it, with tools/layout/ch26/cap_layouts.py and tools/figs/ch26_capacitors.py: a 0.2 pF MIM capacitor and a two-turn inductor with a wider track.

Checkpoint: the bottom-plate fraction against Eq. (26.3), and how the inductance and the quality factor of the spiral change.

Week 24 · Matching layout

Read: Chapter 27.

Lab: the experiments of Chapter 27’s Try-it, with tools/layout/ch27/match_layouts.py, tools/figs/ch27_matching.py and tools/figs/_ch27_sim.py: a new resistor pattern, your own C-DAC assignment and more dummy fingers.

Checkpoint: the gradient error each pattern leaves, and how many dummy fingers bring the SKY130 PMOS stress mismatch below its random σ.

Week 25 · Bipolar transistors and diodes

Read: Chapter 28.

Lab: the experiments of Chapter 28’s Try-it, with tools/layout/ch28/bjt_layouts.py, tools/figs/_ch28_sim.py and tools/figs/ch28_bipolar.py: a smaller SKY130 PNP unit, a higher bias current and your own 8:1 placement.

Checkpoint: the size and DRC status of the smaller array, which devices leave the PTAT window at 10 µA, and the error your placement leaves.

Week 26 · Power devices, guard rings and ESD

Read: Chapter 29.

Lab: the experiments of Chapter 29’s Try-it, with tools/figs/ch29_power.py and tools/figs/_ch29_sim.py: a 0.25 Ω power switch, more rail resistance in the HBM path, and the guard ring moved next to the victim.

Checkpoint: the metallization pattern that meets the target, the rail resistance the SKY130 pad tolerates, and whether the side of the guard ring matters.

Week 27 · Assembling the die

Read: Chapter 30.

Lab: the experiments of Chapter 30’s Try-it, with tools/layout/ch30/assemble_die.py and tools/figs/ch30_die.py: a test chip with three pads per side, the LDO moved next to the device under test, and a narrower power grid.

Checkpoint: the die size and whether it is pad-limited, the recommended pad rules that return without the TopMetal2 exit, and the narrowest grid that keeps the IR drop below 1 % of VDD.

Assessment suggestions

For a credit-bearing course we suggest: weekly lab checkpoints (40 %), the questions and extension tasks of the labs (20 %), and the course project (40 %). The project is the two-stage OTA of Chapter 12 in one PDK, assessed on a short report that states its specification table at tt and over corners and temperature, its input-referred noise and offset, the status of DRC and LVS, and its performance before and after layout, and that justifies the choices that led there: the gm/ID and length of every device, Cc and Rz. To give every student a different design, vary the specification, for example the bandwidth (Lab 6’s extension asks for 40 MHz) or the load capacitance.

Shorter versions

Eight weeks. Keep Week 0, then one week each for Chapters 4–5 with Lab 1, Chapter 6 with Lab 2, Chapters 7–8 with Labs 3 and 4, Chapters 9–10 with Lab 5, Chapters 11–12 with Lab 6, Chapter 13 with Lab 7, and Chapters 15–16 with Lab 8. Read Chapters 1, 3, 14 and 17 for their objectives and key takeaways only.

Four weeks, for analog designers new to the open tools. Week 0; Chapters 3 and 6 with Lab 2; Chapter 12 with Lab 6; Chapters 15–17 with Lab 8.

Two days. Chapters 2 and 6 with Labs 0 and 2 on the first day; Chapters 10 and 12 with a guided version of Labs 5 and 6 on the second.


Back to top

SkillSurf · The Art of Analog IC Design, draft v0.1 (November 2026). Every source is listed on the References page.

© 2025–2026 SkillSurf. Text, figures and 3D models: CC BY 4.0; code: MIT. The SkillSurf name and logo are not covered.

This course was written with the help of AI tools and may contain mistakes. If you find one, please tell us through SkillSurf or email skillsurfedu@gmail.com, and we will correct it.